by Brent Chapman | Oct 28, 2026 | Uncategorized
Most incident management programs eventually face the same question from leadership: what should our resolution time target be? The reasoning is intuitive. The company is investing in the practice; leadership wants to know it’s working. And resolution time feels like the obvious metric. If incidents are getting resolved faster, things must be improving.
The trouble is that incident resolution time depends on the nature of the incident, not just on the process. A config change that spikes latency on one service until someone rolls it back is a different problem than a cascading failure during peak traffic. They take different amounts of time because they are, in every practical sense, different kinds of work. A fixed target is either trivially easy for one or impossibly hard for the other.
Once the target is set, Goodhart’s Law kicks in: when a metric becomes a target, it ceases to be a good metric. People find ways to hit the number, and not all of those ways involve actually improving. I wrote about this dynamic at length in “The incident metrics mirage”; the short version is that targets on uncontrollable metrics produce gaming, not because anyone is dishonest, but because that’s what targets on uncontrollable metrics always produce.
So the VP’s next question is fair: “Fine, then what do I set targets on?”
A pattern worth studying from fire departments
Fire departments face a version of the same problem. The total time from a 911 call to resolution varies enormously based on the nature of the call. But fire departments still need to measure performance and answer for it. Their approach is to decompose the total timeline into sequential segments and ask which ones are consistent enough to target.
My local department, the Sacramento Metropolitan Fire District, publishes its Standards of Cover openly, as many leading departments do. It’s both a policy and a performance report: it sets service level objectives for response time and reports how the department actually performed against them in the prior year. It includes a ten-page section on response time objectives, but says nothing about targets or SLOs for total incident duration.
Response time is the time from when the 911 call comes in to when the first responding unit arrives on scene. They break it into three parts:
- Dispatch time: the time it takes for the 911 operator to answer the call, determine what response is needed, and dispatch the appropriate responders.
- Turnout time: the time it takes for the responders to get suited up, into their vehicles, and out the door of the station, on their way to the scene.
- Travel time: the time it takes them to get from the station to the scene.
They track and set targets for those, because they’re pretty much the same from one emergency to the next. It doesn’t take longer to answer the phone when it’s a fire call versus a medical call. It doesn’t take longer to get out the door depending on the type of call. Travel time does vary, but by geography and population density (it takes longer to get from the station to the scene in lightly populated rural areas than in densely populated urban areas); it doesn’t vary by type of call (they don’t drive faster to reach car crashes than fire calls or medical calls, for example).
But there’s nothing in there about how long they spend dealing with the emergency once they arrive on scene, because that varies enormously from one emergency to the next. A kitchen grease fire that’s already out when crews arrive is a different problem than a fully involved warehouse fire. A fender-bender is a different problem than a multi-vehicle accident with trapped occupants needing extrication. The time on scene might be twenty minutes or twelve hours, and no target could meaningfully apply to both ends of that range.
Each targeted segment is something the department can actually control. Dispatch too slow? Hire more 911 operators. Turnout too slow? Change how crews and equipment stage at the firehouse. Travel too slow? Build more stations or redraw coverage zones. The targets are on the parts they can fix.
Applying the same principle to software incidents
A similar decomposition maps onto a software incident timeline, and the controllability test works the same way. Some parts of that timeline look roughly the same from one incident to the next: pager acknowledgment time, time to staff the incident channel, time to post a first customer update, and so on. These are process steps that don’t depend on whether the incident is a database failover or a payment processing outage. 90th-percentile targets make sense for them. “90% of pages acknowledged within 60 seconds” is a meaningful target because the process of acknowledging a page doesn’t vary with what the page is about.
Diagnosis time, time to mitigation, time to a durable fix, and the like: those depend on the incident itself. They vary by orders of magnitude for perfectly good reasons. I recommend tracking trends across quarters and investigating outliers. An unusually long time to mitigate might signal a tooling gap or a training need, and that’s worth looking into. But a fixed target for these segments invites the same gaming dynamics.
Controllability is a spectrum, not a clean binary. Time to first customer update is controllable even though it isn’t part of the initial dispatch chain of page-acknowledge-staff. Some process steps in the middle of the timeline are partly controllable; it takes judgment to decide which ones are consistent enough to target. The test I use with clients: if you can write down two or three specific things you’d change to improve this segment, it’s controllable enough to target. If the answer is “it depends on the incident,” it isn’t.
And every shortened segment has a cost somewhere. Faster detection usually means more aggressive monitoring thresholds and more false positives. Faster response usually means more intrusive on-call expectations. Faster staffing might mean a broader auto-page policy that pulls more people in, more often, for incidents that might not need them. These are real tradeoffs, not free improvements. Good measurement helps companies make them deliberately rather than stumbling into them, and the only way to make them deliberately is to know which segments you’re choosing to shorten and what that costs.
Answering common objections
For companies currently committed to a resolution time number that won’t go away, I’d recommend at least switching from averages to percentiles. P50, P90, P95 represent real experiences. MTTR, which averages power-law data, represents nobody’s. But even percentiles struggle to detect real improvement in incident data; the underlying distributions are too variable and too sparse for any summary statistic to show trends reliably (I dug into why in “The incident metrics mirage”).
The other objection I hear often is “resolution time is what customers feel.” It isn’t, quite, for two reasons.
First, customers don’t feel resolution; they feel mitigation. The customer’s experience improves when the service starts working again, not when the engineering team finishes the durable fix, which might come hours or days later. That distinction matters for what you measure: time to resolution conflates two different things the team does at two different times for two different reasons.
It also matters for where you invest. Prioritizing mitigation over resolution, and investing in generic mitigations (e.g., rollbacks, feature flag toggles, traffic shifting, failover to a secondary) that can often restore service before you even understand what went wrong, will do more for the customer experience than any resolution time target ever could. (I wrote more about the mitigation-first approach in a previous post.)
Second, customer experience during normal operations is best measured through SLOs such as availability, latency, and error rates, measured from the customer’s perspective. Incident metrics measure internal coordination during emergencies. These are related but different things, and conflating them misleads any company that tries. Jamie Luck and Laura de Vesine made this point well in their SREcon25 talk on incident metrics.
What I recommend to the companies I work with is straightforward: percentile targets for things like pager acknowledgment, channel staffing time, initial severity assessment, first customer update, and whatever other process steps they can control. It’s OK to track trends for everything else, but remember that the incident data is sparse and wildly variable. A single extreme reading can cause a huge swing, and even a real improvement may not show up in the numbers for a long time. When an outlier looks interesting, investigate it.
So when the VP asks “what should our incident resolution time target be?”, the honest answer is: you shouldn’t have one, because that’s outside your control. Focus on what you can control, instead.
by Brent Chapman | Oct 13, 2026 | Uncategorized
At all too many companies, post-incident action items get marked P0, but never actually get done. They pile up into a sedimentary layer of “P0” items that “everybody knows” are really P3. I think the problem is structural, and the fix is simpler than most incident management programs make it.
Prioritization is a business decision. Deferring a post-incident action item is just another prioritization call. The product owner or engineering manager who deprioritizes a post-incident monitoring improvement in favor of feature work is making a tradeoff, the same kind they make for every other piece of work. Most companies handle incident action items in ways that either hide that decision or try to prevent it from being made at all.
Three things need to change. Reviews should produce descriptions of problems, rather than half-designed solutions. The resulting action items should live in the owning team’s regular backlog, where they compete on their merits. And when one gets deprioritized, somebody should write down why.
Have reviews produce problem statements
Post-incident reviews often produce action items the way brainstorming sessions produce ideas: freely, and without filtering for feasibility or cost. Some come out too vague to act on at all (“improve monitoring for the payments service”). Others are solutions somebody proposed off the cuff (“quadruple our metrics sampling rate”), before anyone has looked at whether it’s the right fix, what it would displace, or what it would cost.
The review’s job should be to surface problems (“lags in the monitoring pipeline meant that we didn’t notice this for 40 minutes”); designing solutions and weighing their costs come later. Evaluating the cost and feasibility of a fix belongs in planning, and part of the reason is who’s in the room. There’s overlap between the people in a review and the people you’d want for a good design discussion, but it’s often not the right overlap: the review has the responders and the incident commander, but maybe not the engineer who knows why the sampling rate is set where it is, or whoever owns the observability budget, or the team lead who knows what else is in the queue, and so forth. (A team that sat down to design that sampling-rate change would notice, among other things, that it also quadruples the metrics bill.)
So the review’s output should be input to the owning team’s planning process. Write each action item as a description of the problem, and let the team that owns the affected system design and prioritize the fix.
Track action items in the team’s regular backlog
Even well-written post-incident action items often never make it into anybody’s planning process. They get labeled P0 or Critical during the review, but just languish thereafter. Often it’s because they land in a dedicated incident tracker or a separate incident-related Jira project, and the product owner or engineering manager who runs the team’s sprint planning never notices them unless they intentionally go hunting for them. And the parallel system usually has its own priority scale. It looks the same as the team’s, but a P0 there isn’t a P0 in the backlog the team actually works from.
If the items are landing in a parallel system, that system shouldn’t exist. Instead, create them in the owning team’s regular backlog from the start, tagged so they can be found and reported on, but living alongside the feature work, the bug fixes, the tech debt, the customer escalations, and everything else the team is determining relative priorities for.
Make honest deferral normal, and record it
Once the items are in the team’s backlog, they often carry a “magic aura” of being incident-related that makes people unwilling to honestly reprioritize, rewrite, or close them, because that feels like saying “I don’t care if this happens again.” So nobody touches them; everybody just silently ignores them, whistling past the graveyard. The items still lose out to other work, sprint after sprint, so the tradeoff is still being made; it’s just that nobody is making it explicitly.
This part of the problem is cultural, and harder to fix. Leadership has to actively make it safe to reprioritize incident-related items, and the planning process has to treat honest deferral as a normal outcome, not something people do quietly and hope nobody notices.
A simple habit helps a lot here: when an incident-related action item doesn’t make the prioritization cut, note the decision. Put it in the team’s own planning notes, or wherever the prioritization decisions live (a quarterly planning doc, the sprint retrospective notes, even the Slack thread where the tradeoff was discussed), rather than in an incident tracker that nobody checks.
The note doesn’t need to be elaborate. “Deferred the fix for the monitoring pipeline lag from INC-2847; it didn’t make the cut against this quarter’s commitments. Until we revisit it in Q4, we accept that this failure mode may take 30 to 40 minutes to detect.” Two sentences, thirty seconds to write.
Eventually, the failure mode that the action item was supposed to address will contribute to a new incident. When it does, the review can point to the documented deferral: “We knew about this. We made a conscious decision to accept the risk, and here’s what we weighed it against.” That’s a business decision being revisited, not a failure being discovered. The conversation focuses on whether to adjust the business priorities and resource allocations that led to the decision, which is productive.
Without the documentation, the same moment looks very different. Someone finds the old action item, still open, still marked P0 but treated as a P3 ever since, and the room has to decide whether to treat it as negligence or bad luck. The folks who made the tradeoff may not even remember making it. The conversation drifts toward blame for the deferral, and the new incident’s own contributing factors get less attention than they should.
Don’t make them special
The natural objection is that the post-incident action items will lose the prioritization fight. Feature work has product managers advocating for it and revenue targets pulling it forward. Post-incident action items are mostly reliability improvements, and reliability work often doesn’t have anyone in the room speaking for it. Won’t the incident items just get deprioritized every sprint?
Maybe. But that might be the right outcome from the business’ perspective. At the very least, it’s the honest one: it reflects what the business is actually prioritizing, rather than trying to move the argument underground by giving incident items special treatment.
That’s what a lot of incident management programs try to do: mandatory completion windows, separate reporting to leadership, policies that say you can’t close the incident until the items are done. The intent is to protect reliability work from being crowded out. What it actually does is create a priority system that runs outside the normal planning process, which is the same parallel-system problem described above.
Worse, if the special treatment works, people learn. Once the incident process is the easiest path to engineering resources, folks start routing work through it: declaring incidents for the side effects, writing review items that are really feature requests, framing tech debt as incident follow-up because that’s the label that gets it built, and so on. People are doing exactly what the incentives tell them to do.
If the special treatment doesn’t work (which is more common), you’re back to the sedimentary layer of “P0” items, plus a monthly report that the incident management program manager produces and the engineering managers politely ignore.
The better answer is to let the items compete, and make the competition honest. If reliability work consistently loses to feature work across teams and across quarters, that’s a real finding about how much engineering capacity your company is actually willing to spend on reliability, and it’s worth surfacing to leadership as exactly that. The question of how much capacity goes to resilience is a conversation for the executive team, and gaming the planning process can’t settle it.
What changes
Teams are already making these tradeoff decisions every sprint and every quarter, deciding what to build and what to defer, with more context about their team’s priorities than anyone else in the room. Post-incident action items should be one more input to that process: described as problems, tracked in the team’s own backlog, and allowed to lose, as long as the decision gets recorded. They shouldn’t get to jump the queue just because they came out of an incident.
Whatever a company’s process looks like today, the missing step is usually the same: the next time a team deprioritizes a post-incident action item, write down why.
by Brent Chapman | Oct 6, 2026 | Uncategorized
Many companies are frustrated that too many of their outages are detected first by customers, rather than by their own monitoring. They create more alerts, but it doesn’t seem to help. Often, the problem is that they’re still focusing on how their machines are performing, not what their users are experiencing.
Alerting on what’s easy vs. what’s useful
The first alerts most companies build are around infrastructure internals: CPU utilization, memory consumption, disk space, network bandwidth. There’s a simple reason for that: infrastructure metrics are easy to collect. You ask the operating system how busy the CPU is, and it tells you. Every monitoring system ships with infrastructure-metric collection out of the box.
If you stop there, though, you’re only alerting on what your servers can tell you about themselves, and while that might be useful diagnostic info, it’s actually not all that useful as a basis for alerts. It tends to lead to a lot of false alerts, which in turn leads to alert fatigue for your engineers.
User-experience metrics are harder to measure. To properly measure page load time from the user’s perspective, you have to instrument the client side, which for a web app means dealing with browser diversity, network variability, caching effects, and the gap between what your server thinks it sent and what the user actually saw. The infrastructure metrics are right there; the user-experience metrics take real engineering effort to build. While that might explain why teams start with infrastructure metrics, it’s not a good reason to keep paging on them once you know better.
Work metrics vs. resource metrics
Datadog’s Monitoring 101 tutorial draws a useful distinction between “work metrics” and “resource metrics.” Work metrics measure the output your system is producing for users: are requests succeeding, are they fast enough, are scheduled jobs finishing on time. Resource metrics measure the system’s internal state. Both matter, but they matter for different things.
A service running at 95% CPU utilization that’s responding to every request within its latency target isn’t having an incident. The CPU is high, but users are happy. High CPU utilization is often a goal; anything less means you’re paying for capacity you’re not using.
On the other hand, a service running at 5% CPU utilization that’s returning errors on half its requests is very much having an incident. The CPU metric is fine, but the user experience isn’t.
It’s tempting to try to make CPU alerts better by alerting on low CPU too, and then setting different thresholds for batch systems and interactive ones, and tuning them by time of day. But that’s whack-a-mole. In either scenario, the CPU number isn’t a useful basis for an alert (though it might be a useful diagnostic tool; it belongs on a dashboard, not in an alert).
What to actually page on
What tells you that users are affected are things like the success rate and latency of user requests. Those are work metrics, not resource metrics, and they measure things your users actually care about, so page on those metrics. CPU utilization (a resource metric) isn’t something your users care about.
Your specific thresholds will vary, but the kinds of alerts worth paging on look something like this:
- Login success rate has dropped below 90%
- Homepage latency has exceeded ten seconds for the past five minutes
- User accounts are being locked at an unusual rate because of repeated payment failures
- Payment processing error rate has spiked above 2%
- Search result quality score (i.e., the percentage of queries returning relevant results) has fallen below threshold
These are all alerts where, if they fire, someone needs to look at them right now. The person who gets paged can immediately understand what users are experiencing and start investigating why. Compare that with “CPU on server-42 exceeded 90%”: the on-call engineer first has to spend ten minutes figuring out whether the alert actually matters and whether any users are affected.
Google’s SRE book popularized the “four golden signals” framework for this kind of user-focused monitoring: latency, traffic, errors, and saturation. It’s a solid starting point, but you’ll also need domain-specific signals: transaction success rates for a payment service, delivery latency for a messaging system, buffering events for a video platform, completion rates for a workflow engine, and so on.
The orientation matters more than the specific framework: are you measuring from the user’s perspective or from the infrastructure’s perspective? A team that’s tracking three user-focused metrics they chose themselves is in better shape than a team with an elaborate monitoring stack that’s still paging on CPU utilization.
Where resource metrics belong
Resource metrics are definitely useful, just not as a basis for paging someone. The pushback you’ll hear from infrastructure and capacity-planning teams is legitimate: if you don’t alert on disk space trending toward full, you’ll eventually have an outage that could have been prevented. That’s true, but this is where it pays to draw a distinction between “alerting” and “paging.”
An alert on disk space doesn’t always need to page someone; usually, it can open a ticket instead. The deciding factor is urgency. A disk that’s going to fill up in a week is a capacity-planning ticket, not a 3 AM page. The disk isn’t affecting users yet, and the remediation (i.e., provisioning more storage or cleaning up old data) isn’t the kind of work you do at 3 AM anyway. If you page on it, you’ve woken someone up to create a ticket they’ll work on during business hours. A disk that’s going to fill up in an hour, on the other hand, is worth a page, because users are about to be affected.
The same logic applies to predictive CPU alerts, memory trends, certificate expiration warnings, and similar leading indicators. They’re valuable as tickets, dashboards, and weekly review items. Unless the failure is imminent, put them on a dashboard and set a ticket to investigate during business hours. Page on the work metrics, and truly imminent resource failures.
Even on the dashboard, though, treat resource metrics with appropriate skepticism. Emergency medics have a saying: treat the patient, not the monitor. The heart rate might have dropped to zero because the patient is having a heart attack, or maybe it’s just because the monitoring wire got disconnected. Resource metrics have similar pitfalls: a CPU spike might be a container scheduling artifact, a sudden change in memory usage might be normal caching behavior rather than a leak. The numbers are useful context for diagnosing a problem you already know about, but they don’t tell you enough about user impact to be your primary detection mechanism.
Alert fatigue makes it worse
The real danger of paging on resource metrics isn’t just the wasted wake-ups. It’s what those wasted wake-ups do to your team’s response to every page, including the ones that matter.
If your on-call engineer gets paged ten times overnight and nine of those pages turn out to be CPU spikes that resolve on their own or disk space that won’t fill up for another week, it’s human nature to start treating pages as probably unimportant. When the tenth page is the real thing (login success has dropped to 50%), they may not respond with the urgency it deserves. Alert fatigue builds gradually through accumulated low-value alerts, and it’s basically invisible until something bad falls through the cracks.
One practice I saw work well at Google was making alert review a standing agenda item in the weekly ops review. SRE teams would review every alert that had paged the team during the prior week, and for each one they’d ask whether it was actionable, whether it led to real work that needed to be done immediately, and whether the threshold should be adjusted or the alert removed (or changed from paging to opening a ticket).
The practice implies something important about paging volume, namely that it should be low enough that reviewing every page from the past week is feasible in one portion of a meeting that has other topics to cover. If you can’t get through the list, you’re getting paged too often.
When your customers detect problems first
At Slack, we did find one easy-to-measure thing that was a good indicator of customer problems: the page view rate of our public status site. Whenever we saw a spike in folks checking the status site, we could be pretty sure that something was wrong, even if we hadn’t gotten any other alerts yet. It was a sure sign that we should go hunting, until we found what was driving users to our status site.
When users experience something unexpected, some of them will check your status page to see if the problem is on their end or yours. A spike means that a meaningful number of your users just asked that question at the same time. And that signal is especially valuable because it’s independent of your production monitoring. If your monitoring has a blind spot, your users’ collective behavior fills the gap.
Even with well-tuned work-metric alerting, you’ll likely still have blind spots: failure modes you didn’t anticipate, work metrics you didn’t think to track (yet), and so forth. When those gaps show up, they’ll usually show up through your customers: status page spikes, but also support tickets and social media mentions. So, besides monitoring for status page spikes, make sure your support and social media teams can escalate quickly to engineering. And when customers turn out to be your first source of detection for an incident, note it during the post-incident review and ask how automated monitoring could have caught it first. Each time that happens, it’s an opportunity to close a gap.
Where to start
Next time someone asks “why didn’t monitoring catch it?”, the answer shouldn’t be “we were watching the CPU.” A few things you can do right now:
- Pick the few most important things your users do with your product, alert on whether those things are working, and make those the alerts that page.
- Monitor your status page view rate.
- Make sure your customer support and social media teams have a rapid escalation path to engineering for when they start hearing about the same problem from multiple users.
Recent Comments